{"title":"OHS Risk Management","description":"","products":[{"product_id":"workplace-health-and-safety-policy-procedures-pack","title":"Workplace Health and Safety Policy \u0026 Procedures Pack","description":"\u003cp data-rte-preserve-empty=\"true\" data-pm-slice=\"1 1 []\"\u003eThe \u003cstrong\u003eWorkplace Health and Safety Policy \u0026amp; Procedures Pack\u003c\/strong\u003e provides a \u003cstrong\u003esimple, practical foundation\u003c\/strong\u003e for managing workplace health and safety in small and medium businesses.\u003c\/p\u003e\n\u003cp data-rte-preserve-empty=\"true\"\u003eIt is designed for organisations that need \u003cstrong\u003ebaseline OHS \/ WHS compliance\u003c\/strong\u003e in place or want to formalise existing safety documents, without building a full safety management system.\u003c\/p\u003e\n\u003cp data-rte-preserve-empty=\"true\"\u003e\u003cstrong\u003eIncluded in this pack:\u003c\/strong\u003e an OHS policy, risk management procedure, incident reporting and investigation forms, risk assessment template, induction and consultation records.\u003c\/p\u003e\n\u003cp data-rte-preserve-empty=\"true\"\u003eThe pack reflects the \u003cstrong\u003eintent of modern OHS \/ WHS legislation\u003c\/strong\u003e and \u003cstrong\u003eISO 45001 principles\u003c\/strong\u003e, while remaining easy to understand and apply in real workplaces.\u003c\/p\u003e","brand":"RAS Shop","offers":[{"title":"Default Title","offer_id":44779412815926,"sku":null,"price":450.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0716\/1983\/8006\/files\/WorkplaceHealth_SafetyComplianceStarterPack.png?v=1770082584"},{"product_id":"swms-grc-safe-work-method-statement-swms-template-general-residential-construction-fully-editable-word-doc","title":"Safe Work Method Statement (SWMS):General Residential Construction","description":"\u003cp data-path-to-node=\"6\"\u003e\u003cb data-path-to-node=\"6\" data-index-in-node=\"0\"\u003eStreamline Housing Site Safety Frameworks \u0026amp; Protect Your Team\u003c\/b\u003e Fulfill your operational safety objectives with this professionally engineered, fully customizable Safe Work Method Statement (SWMS) template. Designed specifically for the residential sector, this digital product takes the guesswork out of documenting high-risk construction work (HRCW) across domestic housing developments, single-dwelling builds, and multi-unit projects.\u003c\/p\u003e\n\u003cp data-path-to-node=\"7\"\u003eWhether you are organizing project workflows, onboarding sub-contractors, managing wall framing installations, or establishing control measures for roof truss erection, this document provides a rock-solid, professional administrative framework built for active building sites.\u003c\/p\u003e\n\u003ch4 data-path-to-node=\"9\"\u003e\u003cb data-path-to-node=\"9\" data-index-in-node=\"0\"\u003eWhy Choose This Residential SWMS Template?\u003c\/b\u003e\u003c\/h4\u003e\n\u003cul data-path-to-node=\"10\"\u003e\n\u003cli\u003e\n\u003cp data-path-to-node=\"10,0,0\"\u003e\u003cb data-path-to-node=\"10,0,0\" data-index-in-node=\"0\"\u003eTailored for Domestic Housing Workflows:\u003c\/b\u003e Built out to easily map specific residential hazards—including roof truss handling, perimeter wall framing, scaffold work, and working near external building building lines.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp data-path-to-node=\"10,1,0\"\u003e\u003cb data-path-to-node=\"10,1,0\" data-index-in-node=\"0\"\u003e100% Editable MS Word Format (.docx):\u003c\/b\u003e Effortlessly insert your company branding, logo, project-specific roles, and unique job site locations. Unlike rigid document marketplaces, there are zero extra upcharges or fees to apply your own logo.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp data-path-to-node=\"10,2,0\"\u003e\u003cb data-path-to-node=\"10,2,0\" data-index-in-node=\"0\"\u003eStructured for Victorian Statutory Alignment:\u003c\/b\u003e Formatted to mirror the document layouts expected under the \u003cb data-path-to-node=\"10,2,0\" data-index-in-node=\"106\"\u003eOccupational Health and Safety Regulations 2017 (OHS Regulations)\u003c\/b\u003e and supports your organizational mechanisms for general duty management under \u003cb data-path-to-node=\"10,2,0\" data-index-in-node=\"250\"\u003eSection 21 of the OHS Act 2004\u003c\/b\u003e.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp data-path-to-node=\"10,3,0\"\u003e\u003cb data-path-to-node=\"10,3,0\" data-index-in-node=\"0\"\u003eInteractive HRCW Checklist Panels:\u003c\/b\u003e Built-in interactive checkboxes allow you to seamlessly isolate active High-Risk Construction Work (HRCW) indicators common to housing sites, such as the risk of a person falling more than 2 meters, operating powered mobile plant, or working adjacent to roadway assets.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp data-path-to-node=\"10,4,0\"\u003e\u003cb data-path-to-node=\"10,4,0\" data-index-in-node=\"0\"\u003eClean Operational Layout:\u003c\/b\u003e Structured into a sequential risk matrix with alternating row padding to maximize visual clarity for site supervisors, builders, and tradespeople under fast-moving site conditions.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4 data-path-to-node=\"12\"\u003e\u003cb data-path-to-node=\"12\" data-index-in-node=\"0\"\u003eWhat’s Included in Your Digital Download:\u003c\/b\u003e\u003c\/h4\u003e\n\u003cul data-path-to-node=\"13\"\u003e\n\u003cli\u003e\n\u003cp data-path-to-node=\"13,0,0\"\u003e\u003cb data-path-to-node=\"13,0,0\" data-index-in-node=\"0\"\u003eInstant Access File:\u003c\/b\u003e Fully unlocked, unrestricted \u003ccode data-path-to-node=\"13,0,0\" data-index-in-node=\"50\"\u003e.docx\u003c\/code\u003e file template.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp data-path-to-node=\"13,1,0\"\u003e\u003cb data-path-to-node=\"13,1,0\" data-index-in-node=\"0\"\u003eComprehensive Header Tracking Data:\u003c\/b\u003e Pre-built fields for Principal Contractor tracking, work supervisor oversight logs, and mandatory document version history controls.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp data-path-to-node=\"13,2,0\"\u003e\u003cb data-path-to-node=\"13,2,0\" data-index-in-node=\"0\"\u003eConsultation-Ready Sign-Off Panel:\u003c\/b\u003e Expanded formatting explicitly designed to satisfy the strict employee and Health \u0026amp; Safety Representative (HSR) manual consultation sign-off workflows required by WorkSafe compliance guidelines.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp data-path-to-node=\"13,3,0\"\u003e\u003cb data-path-to-node=\"13,3,0\" data-index-in-node=\"0\"\u003eReview \u0026amp; Revision Log:\u003c\/b\u003e Pre-structured tracking fields to easily log mandatory operational changes or post-incident review updates, helping protect your company's formal state of knowledge records.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4 data-path-to-node=\"15\"\u003e\u003cb data-path-to-node=\"15\" data-index-in-node=\"0\"\u003eSpecifications:\u003c\/b\u003e\u003c\/h4\u003e\n\u003cul data-path-to-node=\"16\"\u003e\n\u003cli\u003e\n\u003cp data-path-to-node=\"16,0,0\"\u003e\u003cb data-path-to-node=\"16,0,0\" data-index-in-node=\"0\"\u003eFile Format:\u003c\/b\u003e Microsoft Word (.docx)\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp data-path-to-node=\"16,1,0\"\u003e\u003cb data-path-to-node=\"16,1,0\" data-index-in-node=\"0\"\u003eDelivery:\u003c\/b\u003e Instant digital download link sent straight to your email inbox after checkout.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp data-path-to-node=\"16,2,0\"\u003e\u003cb data-path-to-node=\"16,2,0\" data-index-in-node=\"0\"\u003eDocument License:\u003c\/b\u003e Single business use (unlimited project edits).\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp data-path-to-node=\"17\"\u003e\u003ci data-path-to-node=\"17\" data-index-in-node=\"0\"\u003eDisclaimer: This document is a customizable template framework designed to assist businesses with hazard identification layouts. The use of this template does not automatically guarantee site compliance, as ultimate compliance depends upon project-specific accuracy, live site implementation, and accurate completion by the duty holder.\u003c\/i\u003e\u003c\/p\u003e","brand":"RAS Shop","offers":[{"title":"Default Title","offer_id":46526912430134,"sku":null,"price":45.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0716\/1983\/8006\/files\/SWMS-General_Residential_Construction.png?v=1780899701"},{"product_id":"safe-work-method-statement-swms-residential-solar-installation","title":"Safe Work Method Statement (SWMS): Residential Solar PV Installation","description":"\u003cp class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"\u003e\u003cstrong\u003eLock Down Rooftop Solar Site Safety \u0026amp; Protect Your Crew\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"\u003eMeet your operational safety obligations with this professionally engineered, fully customizable Safe Work Method Statement (SWMS) template, built specifically for residential rooftop solar PV installation. This digital product takes the guesswork out of documenting high-risk construction work (HRCW) across single-storey and two-storey homes—from roof access and panel mounting through to DC array assembly, inverter and isolator connection, and grid tie-in.\u003c\/p\u003e\n\u003cp class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"\u003eWhether you're onboarding sub-contractors, planning a roof-edge protection set-up, coordinating a panel lift, or defining control measures for energised electrical work, this document gives you a rock-solid, professional administrative framework built for active solar job sites.\u003c\/p\u003e\n\u003cp class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"\u003e\u003cstrong\u003eWhy Choose This Solar SWMS Template?\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul class=\"[li_\u0026amp;]:mb-0 [li_\u0026amp;]:mt-1 [li_\u0026amp;]:gap-1 [\u0026amp;:not(:last-child)_ul]:pb-1 [\u0026amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3\"\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003e\n\u003cstrong\u003eTailored for Rooftop Solar Workflows:\u003c\/strong\u003e Mapped to the hazards that actually define solar installs—working at height over 2 metres on pitched roofs, PV modules that are live whenever exposed to daylight, switchboard and grid connection, panel manual handling, and EWP \/ powered panel-hoist use on single- and two-storey homes.\u003c\/li\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003e\n\u003cstrong\u003e100% Editable MS Word Format (.docx):\u003c\/strong\u003e Effortlessly drop in your company branding, logo, project-specific roles, and job-site locations. Unlike rigid document marketplaces, there are zero extra upcharges or fees to apply your own logo.\u003c\/li\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003e\n\u003cstrong\u003eStructured for Victorian Statutory Alignment:\u003c\/strong\u003e Formatted to mirror the document layouts expected under the Occupational Health and Safety Regulations 2017 (including the SWMS requirements at Reg 324 and review triggers at Reg 328) and supports your general duty of care obligations under Section 21 of the OHS Act 2004.\u003c\/li\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003e\n\u003cstrong\u003eInteractive HRCW Checklist Panels:\u003c\/strong\u003e Built-in clickable checkboxes let you isolate the High-Risk Construction Work indicators common to solar—risk of a person falling more than 2 metres and work on or near energised electrical installations come pre-ticked, with powered mobile plant, asbestos disturbance (older roofs\/eaves) and the full 19 Reg 5 triggers ready to toggle.\u003c\/li\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003e\n\u003cstrong\u003eHierarchy-of-Control Layout:\u003c\/strong\u003e Each control is written in strict Elimination → Engineering → Administrative \/ PPE order and cross-referenced to the relevant WorkSafe Victoria compliance codes (Prevention of Falls, Plant, Electrical Installations, Managing\/Removing Asbestos), so a site supervisor or inspector can read and follow it at a glance.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"\u003e\u003cstrong\u003eWhat's Included in Your Digital Download:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul class=\"[li_\u0026amp;]:mb-0 [li_\u0026amp;]:mt-1 [li_\u0026amp;]:gap-1 [\u0026amp;:not(:last-child)_ul]:pb-1 [\u0026amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3\"\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003e\n\u003cstrong\u003eInstant Access File:\u003c\/strong\u003e Fully unlocked, unrestricted \u003ccode class=\"bg-text-200\/5 border border-0.5 border-border-300 text-danger-000 whitespace-pre-wrap rounded-[0.4rem] px-1 py-px text-[0.9rem]\"\u003e.docx\u003c\/code\u003e template.\u003c\/li\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003e\n\u003cstrong\u003eComprehensive Header \u0026amp; Document Control:\u003c\/strong\u003e Pre-built fields for Principal Contractor tracking, work supervisor oversight, a Status dropdown (Draft \/ For Review \/ Approved \/ Superseded), and document version history controls.\u003c\/li\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003e\n\u003cstrong\u003eProject Set-Up Built In:\u003c\/strong\u003e Construction-stage selector (Roofing and Services rough-in pre-ticked for solar) and a People on Site register.\u003c\/li\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003e\n\u003cstrong\u003ePre-Filled Solar Risk Matrix:\u003c\/strong\u003e Ready-written control rows for working at height, energised electrical \/ live DC, powered mobile plant, and asbestos disturbance—plus blank rows for site-specific tasks.\u003c\/li\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003e\n\u003cstrong\u003eConsultation-Ready Sign-Off Panel:\u003c\/strong\u003e Expanded worker and Health \u0026amp; Safety Representative (HSR) acknowledgement formatting to support the consultation and sign-off workflow under Section 35 of the OHS Act 2004.\u003c\/li\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003e\n\u003cstrong\u003eReview \u0026amp; Revision Log:\u003c\/strong\u003e Pre-structured reviewer fields to log operational changes or post-incident reviews, helping protect your company's formal state-of-knowledge records.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"\u003e\u003cstrong\u003eSpecifications:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul class=\"[li_\u0026amp;]:mb-0 [li_\u0026amp;]:mt-1 [li_\u0026amp;]:gap-1 [\u0026amp;:not(:last-child)_ul]:pb-1 [\u0026amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3\"\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003eFile Format: Microsoft Word (.docx)\u003c\/li\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003eDelivery: Instant digital download link sent to your email inbox after checkout.\u003c\/li\u003e\n\u003cli class=\"font-claude-response-body whitespace-normal break-words pl-2\"\u003eDocument License: Single business use (unlimited project edits).\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch5 class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"\u003e\u003cem\u003e\u003cstrong\u003eDisclaimer:\u003c\/strong\u003e This document is a customizable template framework designed to assist businesses with hazard identification and SWMS layout. Use of this template does not automatically guarantee site compliance—ultimate compliance depends on project-specific accuracy, live site implementation, and accurate completion by the duty holder.\u003c\/em\u003e\u003c\/h5\u003e","brand":"RAS Shop","offers":[{"title":"Default Title","offer_id":46529024884790,"sku":null,"price":45.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0716\/1983\/8006\/files\/SWMS-ResidentialSolarInstallation.png?v=1780899753"}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0716\/1983\/8006\/collections\/PPE_Selection_and_Risk_Control_Illustration.png?v=1780904674","url":"https:\/\/store.healthsafetyadvisory.com.au\/collections\/ohs-risk-management.oembed","provider":"RAS Shop","version":"1.0","type":"link"}